OPW Produces Retrofit Fibrelite Sumps to Support BP’s AdBlue UK Program
BP required retrofit chamber systems
Project Overview
OPW was approached by BP who required retrofit chamber systems which could be fitted to AdBlue dispensers at various petrol stations across the UK within a tight timeframe.
Problem
BP required a retrofit watertight chamber system which could be fitted to a GVR Frontier and GVR 700 AdBlue dispenser pump. In some cases, the sumps needed to fit within the HGV raised kerb island a within a tight timeframe.
Fibrelite products enable a more efficient site construction
Solution
OPW developed bespoke Fibrelite dispenser sumps and metal work to incorporate dispenser pumps, in line with BP’s requirements. The sumps had to account for potential shallow burial depths and existing island width, they also had to be adjustable to accommodate site constraints. All sumps are vacuum tested before dispatch to ensure that they are truly watertight.
OPW developed bespoke Fibrelite dispenser sumps for BP
Results
The bespoke dispensers have now been installed at over 40 BP stations (90 systems) across the UK, enabling a faster, more efficient site construction, reducing cost whilst providing a watertight system.