Source: OPW

KPS Piping Helps German BP Site Meet Tight Build Schedule

BP-Aral specified KPS' plastic double wall piping at a  new build site in Hildesheim, Germany

BP-Aral specified KPS' plastic double wall piping at a new build site in Hildesheim, Germany

Project Overview

BP-Aral approached KPS for a new build site in Hildesheim, Germany. Piping had to meet German regulations surrounding tank chambers and to be installed within five working days to meet the strict construction schedule.

KPS piping had to be installed within 5 working days to meet the strict project deadline

KPS piping had to be installed within 5 working days to meet the strict project deadline

Problem

Key requirements for this site:

  • Tank chambers needed to be supplied with pre-made holes
  • Unused holes needed to be watertight when closed but not welded, so that they were accessible for maintenance
  • The vapour recovery (St.1) line (3”, KP 90EC6) needed to be connected to as many tanks as possible
  • Tank chambers needed to be close to each other as T-pieces could not be used (due to regulations)
  • As dispenser sumps are not used in Germany, termination and transition of double wall suction pipes (KP 75/63SCEC8) needed to be done above a dispenser frame in confined spaces
 
KPS provided an installer friendly solution to meet BP-Aral's strict project deadline

KPS provided an installer friendly solution to meet BP-Aral's strict project deadline

Solution

KPS piping provided an easy-install solution for the Hildesheim BP project, which met German forecourt regulations.
Key features included:
• Installer friendly system, minimising the number of welds required (KPS piping system welds both pipe walls simultaneously)
• Blind entry boots (KP TM75/54B and KP TM125/90B) enabled unused holes to be closed without sealing
• In the case of a future extension, the blind boots can be removed with ease. No steel cutting, welding or hot spark work would be required
• The 3” cross fittings made it possible to connect the vapour recovery (St.1) line (3”, KP 90EC6) to multiple tanks
• The KPS (TM75/63SC20) piping was able to fit in the double wall suction lines above the 130mm wide dispenser frame. Alternative piping systems could only fit 250mm dispenser frames
• The ball valve on the test port allowed for testing of the functionality of the leak detection system

 
Tank chambers were supplied with pre-made holes on all chamber walls

Tank chambers were supplied with pre-made holes on all chamber walls

Results

The project was completed within the tight construction schedule and the German requirements were met. Hildesheim Germany now have a reliable below ground fuelling system.

 

Europe, Middle East & Africa Products

OPW Products

Protect people and the environment while enhancing your business performance.

A strong global presence, coupled with extensive engineering, research and testing capabilities, enables OPW to create a steady flow of new products while, at the same time, helping enhance the performance of existing products.

View Our Products

OPW Fluid Transfer Group Europe

OPW Fluid Transfer Group Europe is dedicated to providing expert solutions for the safe handling, processing, monitoring and transportation of hazardous bulk products.

Visit the OPW Fluid Transfer Group Homepage

OPW Fluid Transfer Group Europe

OPW Fluid Transfer Group Europe is dedicated to providing expert solutions for the safe handling, processing, monitoring and transportation of hazardous bulk products.

Visit the OPW Fluid Transfer Group Homepage

OPW Retail Fueling

OPW is revolutionizing fueling operations in Europe, the Middle East and Africa by delivering the most innovative fueling solutions in the industry.

Visit the OPW Retail Fueling Homepage

KPS Petrol Pipe System

KPS leads the development of plastic petrol pipes in the forecourts around the world with safe, reliable and installation friendly products.

Learn More About KPS