Source: OPW
Russian Installation Team Adopts KPS Piping with An Eye Towards the Future
The customer now has a long-lasting KPS solution that will continue to perform year after year
Project Overview
Russian KPS installer VSE DLA AZS has upgraded from using heavy outdated steel pipework in installations to using long lasting KPS conductive plastic pipe.
Problem
The customer who traditionally installed heavy, labour intensive steel pipes across sites in Russia were looking to upgrade to the now industry standard of plastic conductive piping for future installations. The steel piping was challenging to install due to its weight, the pipe also begins to rust over time.
KPS conductive plastic pipe is favoured by Russian installer
Solution
KPS provided theoretical and practical training for the VSE DLA AZS installation team before the project started to ensure they felt confident when installing a new product and so that it was done correctly. The customer has now upgraded to a lightweight new easy install plastic piping.
Training enabled a confident quality installation
Results
The customer now has a long-lasting solution that will continue to perform year after year, the theoretical and practical training provided by KPS enabled a confident quality installation to be carried out by the VSE DLA AZS team.
Theoretical and practical training was provided by KPS