Solution
KPS plastic piping was installed in long curves to fit the layout of the concrete tank sumps, and a hole was cut in the corner of each sump to allow KPS termination fittings to enter, and to be connected to the tanks. KPS' double wall piping prevents leakage, while onsite training (provided by OPW) enabled a fast installation with minimal downtime.
A hole was cut in the corner of each sump to allow the KPS termination fittings to enter
Results
KPS provided BP-Aral's Leipzig site with a corrosion-resistant long-lasting below ground solution that will prevent leakage and continue to perform year after year.
Featured In
ERPEC
Petrol Plaza
Petrol World